Data Consolidate skill

Joins the plant's scheduled exports and connector data into one working dataset — ERP items (NetSuite or Infor M3), sales orders, production work orders, purchase orders, inventory, routings and closed-job operation actuals; CMMS assets and maintenance work orders; and the MES, historian, quality and planning files landing in the Microsoft 365 export folder.

$npx alyn-cli add data-consolidate
View this skill on GitHubanthropics/claude-plugins-official/plugins/claude-for-manufacturing/skills/data-consolidate/SKILL.md
Pack stars
47,283
Pack installs
189k
Alyn Score
79/99
Updated
13 h ago
License
Apache-2.0

Anthropic

Data Consolidate

What is the Data Consolidate skill?

Data Consolidate is a coding skill by Anthropic for Claude Code, Cursor, Codex and other AI coding agents. Joins the plant's scheduled exports and connector data into one working dataset — ERP items (NetSuite or Infor M3), sales orders, production work orders, purchase orders, inventory, routings and closed-job operation actuals; CMMS assets and maintenance work orders; and the MES, historian, quality and planning files landing in the Microsoft 365 export folder.

The foundation layer. The dataset this skill produces is where every data-dependent skill reads from by default, rather than going back to the raw sources — and it is the only place the sources are joined and their key mismatches classified.

What the SKILL.md covers

  • Inputs
  • Workflow
  • Step 1 — Discover
  • Step 2 — Freshness check
  • Step 3 — Pull connector data
  • Step 4 — Normalize keys
  • Step 5 — Join
  • Step 6 — Classify mismatches
  • Step 7 — Count in code, and reconcile before writing
  • Step 8 — Emit
Author
Anthropic
Pack
anthropics/claude-plugins-official (53 skills)
Category
Coding, #247 of 1763
Alyn Score
79 / 99
Files
3, includes references
License
Apache-2.0
Last updated
13 h ago
Works with
Claude Code, Claude, Cursor, Codex, Gemini CLI, Copilot

Data Consolidate compared to similar skills

SkillAlyn ScoreGitHub starsUpdated
Data Consolidate · Anthropic7947k13 h ago
Short Drama Assets · zenstory-ai704.3k2 h ago
AI Sales Champion · staruhub497373 months ago
Context Save · Garry Tan74142k2 h ago

Install Data Consolidate

Pick your agent. Every command is ready to paste.

$npx alyn-cli add data-consolidate

Detects your agents (Claude Code, Cursor, Codex and 70+ more) and installs to the right folder. Add -g to install globally.

$npx skills add anthropics/claude-plugins-official --skill data-consolidate

Or use the open skills CLI directly.

01

Install it

Run the command above, or upload the folder in Claude.

02

Ask naturally

Describe the task. Your agent loads data-consolidate when the request matches its description.

03

Name it if needed

If it does not trigger, say “use the data-consolidate skill”. In Codex, type $data-consolidate.

The skill itself

SKILL.md

FolderGitHub

Data Consolidate

The foundation layer. The dataset this skill produces is where every data-dependent skill reads from by default, rather than going back to the raw sources — and it is the only place the sources are joined and their key mismatches classified.

"By default" is exact, not a hedge. Three skills also read a raw export, and they are right to: see ../../shared/contracts/consolidated-dataset.md, What this dataset is authoritative for. Nothing here carries a high-frequency sensor trace, and a normalized value is not always the value as recorded.

The reason it exists. The majority of real manufacturing data does not arrive through a connector. It arrives as a file. The plant already runs scheduled exports out of its MES, historian, inspection system and planning tool, usually into a shared drive for somebody's spreadsheet. This skill reads that folder plus the live connectors, joins everything on the identifiers the plant already has, and hands back one dataset with every unmatched record explained.

Quick start

"Pull last month's production together with the ERP."

→ Read the export folder; identify each file by name and header signature
→ Report each source's timestamp and coverage window before joining anything
→ Pull the ERP (NetSuite or Infor M3) and any live CMMS connector scoped to the same window
→ Normalize keys up the ladder, logging every rule that fires
→ Join around the five anchors: part, production work order, sales order, lot, asset
→ Classify every mismatch, propose each fix, apply nothing without a yes
→ Emit the dataset and the data quality report

Inputs

First, find the plant setup: from the task's own folder (never cd into the plugin), run python3 -I <this skill's folder>/../../shared/scripts/plant_setup.py find, do its setup_page_first step, then read the profile at profile_path and any rate at rates_path, per ../../shared/replies.md.

Input Source Form
Item / part master The ERP: NetSuite or Infor M3 Connector
Sales orders The ERP Connector
Production work orders The ERP Connector
Purchase orders and suppliers The ERP Connector
Inventory positions The ERP Connector
Routings — operations, work centers, setup and run standards per part and revision NetSuite where manufacturing routings are licensed; else an ERP export or an Excel sheet dropped in. Infor M3 always takes the export Connector, CSV / XLSX
Operation actuals — setup and run hours per closed production work order and operation NetSuite closed work orders where licensed, or Infor M3 work order operations; else an export or an Excel sheet Connector, CSV / XLSX

Which M3 call fills each row, and what M3 does not give, is ../../shared/erp-connectors.md. Read it before an M3 pull. | Assets and maintenance work orders | CMMS | CMMS connector, else the maintenance export | | Actual production output | MES export to the M365 folder | CSV / XLSX | | Downtime events | MES or historian export to the M365 folder | CSV | | Inspection / quality results | Quality system export to the M365 folder | CSV / XLSX | | Planning / schedule | Planning tool export to the M365 folder | CSV / XLSX |

Four of those have no connector and never will. File-only is the designed path, not the degraded one. Routings and actuals are often a spreadsheet someone keeps, and that is a complete input.

The machine class to work center and cell map, the time units, and anything else this skill reads about machining come from ### Machining data in the ## Plant context block, which onboarding writes. Where that section is absent, say so once and carry on without it.


Workflow

Step 1 — Discover

Read the configured export folder. Identify each file by name pattern and header signature, and say what each one was identified as.

Report anything unrecognized rather than guessing. A file that cannot be identified is named and set aside, not silently skipped and not hopefully parsed.

Routings and operation actuals are recognized by header, not by hope. A routing carries part, operation sequence, work center and a setup and run standard; an actuals file carries a production work order, an operation and the hours booked against it. The signatures are in reference/join-keys.md, Routings and operation actuals. A file that looks like either but misses a signature column is unrecognized and named, not loaded with the gap filled.

When the folder holds months of daily files, do not read everything. Offer the choice — latest drop, or a named date range — and state which was used.

onboarding owns the folder path, the file inventory and the refresh cadence — read them from the ## Plant context block rather than asking. If no profile exists, ask for the path once, carry it through the run, and offer onboarding so the next run does not ask again.

If the folder is empty, missing, or there are no files at all, do not stall on discovery. Ask for the date window once, then go to step 3 and run connector-only. In an unattended run (Chain 3, triggered host-side — see ../../shared/scheduling.md) there is no one to ask — use the production-day range from the ## Plant context block instead, per Step 2's fallback, and say the window was chosen rather than inherited from a file. That path is specified under Degradation.

Step 2 — Freshness check

Record every source's last refresh timestamp and the window it covers, and put that in front of the user before any joining or any figure.

Refuse to join sources whose windows do not overlap meaningfully, and say so plainly rather than producing a dataset full of manufactured mismatches. The rule is ../../shared/absent-is-not-zero.md; a stale export is the normal failure here, not the exotic one.

A source timestamp later than the run time is a critical freshness finding. A created, last-modified or transaction date after now means the source's clock is ahead or its data was seeded with future dates; either way none of its as_of values can be trusted. Say so in the banner, by source and with the latest such timestamp, give no "data as of" or age for that source, and do not use its dates to set a window. The rows stay, flagged future_timestamp. A due, promised or delivery date in the future is a commitment, not this finding.

Where the windows overlap only in part, state the overlap in dates and offer exactly two choices, named as such: (1) narrow the join to the overlap, 2026-08-01 to 2026-08-31, or (2) wait for the next export and re-run. Never one choice, and never narrow silently: "I've scoped every total to August" is a decision the user did not make. Whichever they pick, every total below is labelled as scoped to that window.

The window applies by entity, not to every row alike. Narrowing scopes activity records only. Open commitments are kept by status, and reference history by a lookback, because those are exactly the records later skills need. The three kinds, and the lookback, are in reference/join-keys.md, Date windows by entity. Say in the report which kind each tab was scoped as.

Step 3 — Pull connector data

The ERP (NetSuite or Infor M3) and any live CMMS connector, scoped to the same date window as the file exports. Pulling a wider window than the files cover creates Class 7 mismatches out of nothing.

If there are no file exports, the window is the one the user just gave, or the production-day range from the ## Plant context block. Scope the connector pull to that, and say that the window was chosen rather than inherited from a file.

Never hard-fail on a missing custom field. Customers configure NetSuite heavily and field names vary by account. Fall back, and report what could not be read. An Infor M3 search stops at about 30 rows without saying so: pull in slices until one returns fewer, per ../../shared/erp-connectors.md.

Scope every pull by the profile's ### ERP scope, per ../onboarding/reference/erp-scope.md: this plant's subsidiary, locations and parts. With no scope set, say scope not set as a gap, and ask, in so many words: "Which of these items are your plant's parts?", showing what a filter would catch ("10 of 515 items start PN-"). Never pick a filter silently, and never answer "how many parts" with one figure until the scope is answered. Where the scope says production work orders are MES only, take work order identity from the MES export and say so once; never report every MES row as unmatched against an ERP that holds none.

When a connector and an export cover the same entity, check key overlap before joining them. Zero or low overlap means they are not two views of one system: ask which is authoritative (or read the profile's Source of truth line), join only that one, and set the other aside by name. Never merge them, and never report every record of one as unmatched against the other.

Step 4 — Normalize keys

Apply the normalization ladder in order — trim, case, punctuation, leading zeros, revision suffix. Read reference/join-keys.md for the ladder, the six keys and their sources of truth.

Compare on the normalized form and store the original verbatim. Every normalization that fires is logged and reportable. A missing part prefix (4471B against PN-4471-B) is part of rung 3 only where exactly one part on the parts tab matches once its prefix is dropped; the ladder says which prefix it used.

Until a fix is approved, the rows it would join are not joined. They carry join_status: proposed_normalization, and only a yes turns them into normalized. A downstream skill reading the status alone must never take a proposal for a join.

Step 5 — Join

Build the dataset around the anchor entities: part, production work order, sales order, lot, asset. Tabs, columns and required fields are fixed by ../../shared/contracts/consolidated-dataset.md — that schema is the plugin's stable interface and custom-connector maps new systems onto it, so it changes deliberately and with a version bump, never incidentally.

Keep production work orders and maintenance work orders distinct — the two systems use the same word for different records.

Detect unit-of-measure columns and flag a mismatch rather than summing across it. Each versus box of twelve, inches versus millimetres. A total computed across two units is not a total. A units conflict is an integrity flag on the row, carried on the dataset and named in the report: refuse a single total for that key, report each quantity in its own unit, and compute no conversion — not "about 6,200 each if box12 means twelve", not a speculative factor of any kind. What a box12 holds is a fact from the plant, not an inference.

Run the integrity checks on every row, in code, per reference/join-keys.md, Integrity checks: the sign of a quantity (NetSuite writes sales order and fulfilment lines as negative; Infor M3 writes them positive), a downtime event that ends before it starts or whose duration disagrees with its own start and end, and an NCR whose part or date disagrees with the production work order it cites. Each failure is a named value in the row's integrity_flags, counted in the figures block and reported. None is fixed silently.

Time units on routings and actuals get the same rule. Record each time in its source unit with the unit named — minutes or hours, read from the header or a unit column, never from the size of the number. Where a unit is undeclared, or a routing states minutes and the actuals for the same operation state hours, flag it on both rows and compute no conversion into the dataset. The backflush check below may convert for its own comparison, and prints that it did.

Map each work center to its cell through the Machine classes table in the Plant context (its Work centers and Cell columns). A work center the map does not list is named, with its cell left null — not guessed from its name.

Run the backflush check on every actuals row, in code. Set actuals_confidence: probable_standard where actual run hours ÷ quantity matches the routing's run standard within 1%, or where two or more work orders for the same part and operation agree on run hours per unit within about 1%. Real shop time is not that tidy; an ERP posting the standard is. Print the figures that set it, and name the flag by its value, probable_standard, in the report, so the estimator can find it on the tab. The rows stay in the dataset, shown, and quote-build will not rank them above a geometry-derived estimate.

Step 6 — Classify mismatches

Every unmatched record goes into one of the eight classes in reference/mismatch-classes.md, reported separately, with counts and example rows.

Two routing findings are named by what they are. A routing for a part the item master does not hold is an orphan (class 1): routing with no matching part. A routing written for a different revision from the one being quoted or held as current is a routing revision mismatch (class 4), and for routings class 4 has no automatic fix: stripping the revision to make it join would price the new revision on the old one's operations. Detail in reference/mismatch-classes.md.

A one-sided record another source contradicts is not left as nothing wrong. Before calling a record Class 6, check whether another source records the very activity whose absence made it one-sided: an NCR, inspection rows or a lot citing a production work order with no output. Where one does, the record stays Class 6 and carries contradicted_by naming that source and record, and every consumer treats it as an exception. Downtime or maintenance on a machine with no production does not contradict anything.

Check the date window class first. It explains most large mismatch counts, and reporting the other seven on top of an unnoticed window gap sends someone chasing problems that do not exist.

as_of carries a zone, or the row says it could not. The contract requires a timestamp with zone on every row. A NetSuite record gives a date and time; its zone comes from the account's company preference, or failing that from the ## Plant context source-clock row for NetSuite. An Infor M3 record's zone is the server clock (ARS200MI_ServerTimeZone), or the source-clock row for M3. Where neither is available, do not invent a time or a zone: mark the row as_of date-only, flag it, and say which downstream checks that weakens (cross-source correlation in root-cause-capa; cross-midnight attribution in daily-production-report).

Step 7 — Count in code, and reconcile before writing

Every figure the report states — rows in, rows joined, matched exactly, matched after normalization, rows awaiting a proposed fix, records per class, rows per integrity flag, actuals rows flagged probable_standard — is counted in code and put in the figures block (../../shared/computed-figures.md). Reconcile the block before writing a word from it: exact plus normalized equals matched, and the normalized total equals the sum of the classes that make it up. A headline that disagrees with the report's own class counts is the first thing a reader finds, and it discredits every finding beside it.

Step 8 — Emit

The dataset and the data quality report, per Output below.


Approval gates

Propose the fix; never apply it silently. For every mismatch class, produce the correction rather than a count — "37 records match if the Rev 2 suffix is stripped; apply?" — or, where a class has no automatic fix, say so explicitly rather than leaving the finding to speak for itself. The proposal (or the explicit no-automatic-fix statement) is always shown; an applied fix always needs an explicit yes. A flagged mismatch with neither a proposed fix nor a stated reason there isn't one is work handed back to the user, which is the thing this skill exists to stop.

A yes covers what was shown. Every class is presented with its rule, its count and its example rows before anything is applied. Then:

  • "Apply them all" applies every class already shown in this conversation with those details. It is a yes to each of them, because the user has read each of them.
  • Any class not yet shown is presented and asked about first. A blanket yes never reaches a class nobody has read.
  • Classes with no automatic fix are never applied by any yes — duplicate keys, orphans, genuine one-sided records. They are questions, and a yes to "apply the fixes" is not an answer to them.
  • The reply lists each class it applied, with its count, and notes that the verbatim values are kept in the _verbatim columns so any of it can be undone.
  • Each approved rule is saved to the profile's ### Approved normalizations list (rule, both spellings, who said yes, date), where the plant's memory lives per ../../shared/replies.md, and the reply says so. Every later run applies the rules on that list and only those; an overnight run rebuilds the dataset, and without the list every night would re-propose the same fixes.

The rule is ../../shared/approval-gates.md.

A pending decision leads the reply and the report, without replacing either. Above the sources and the details, one bold block headed DECISION REQUIRED: APPROVE OR REJECT for each normalization still awaiting a yes: the exact pair (4471B to PN-4471-B), why it is proposed and its limits, the rows and quantities it touches, what approving and what rejecting each do, and the reply asked for. A rule already on the approved list shows as APPROVED and is never asked again; a rejected one stays unmatched and is not re-proposed. Questions with no automatic fix (orphans, duplicates, missing units) are never folded into the block, and approving the block resolves none of them. With nothing pending, say so in one line and lead with the real next action. The full report keeps every section it had.

  • Duplicate keys have no automatic fix, ever. Surface both rows and let the user say which is real. Never pick, never sum.
  • Orphan records and genuine one-sided records have no automatic fix either — they're questions, not formatting problems. Report them with the evidence that bears on which explanation fits.

This skill writes nothing back to any system of record. It reads, joins, and hands back files.


Output

Every document this skill produces is printed in the reply, in full. Saving a copy to a file as well is fine, as Word or Excel per ../../shared/replies.md, never .txt; a file instead of the reply is not. The person reads the reply, and every delimited block and outbound check lives in it — a document only on disk has been neither seen nor checked. A record handed to another skill is saved and summarised, never pasted as raw YAML; memory blocks are written where the plant's memory lives; and the name on an approval is asked, never taken from the account. All three per ../../shared/replies.md.

The consolidated dataset — one queryable workbook, per ../../shared/contracts/consolidated-dataset.md. One tab per input entity, including inventory (on-hand by part and location, not a single total on parts), ncrs where an NCR export was read, and routings and operation_actuals where those sources exist. XLSX is the v1 writer, not a commitment; the shape is the contract.

The data quality report — rendered as an HTML page in the house artifact style (../../shared/artifact-style.md), using the freshness banner, stat tiles for rows in versus rows joined, a status pill per mismatch class, and a proposal block for anything awaiting a yes. It carries:

  • Source inventory with each source's freshness and coverage window
  • Row counts in versus row counts joined, per entity
  • Mismatches by class, each block headed by its plain-language name with the number in brackets — "Format drift (class 2)" — with its count, its example rows, and how many records would join if the fix were applied
  • Every normalization rule that was applied, and what it touched
  • Where routings or actuals were read: each time-unit flag with both units named, each work center with no cell, and each probable_standard row with the arithmetic that set it — or the routing tab named missing
  • What each finding means for the plant, in one line each
  • The figures block — every count above with the filter that produced it, reconciled per Step 7. The stat tiles and the prose quote it
  • A verbatim lookup, shown by example: the report demonstrates that the _verbatim columns answer a search by the spelling a source prints — one lookup each for a format-drift, a revision-suffix and a case-and-whitespace spelling, each finding its source row. A plant person searches by the number their MES prints, and this is how they know they can. When only one system was read, no second spelling exists: say not applicable: single-source run for the lookups and for classes 2 to 5, rather than inventing an example
  • Every integrity flag raised, by name and count, with example rows: sign conventions applied, downtime that ends before it starts, NCRs that disagree with their work order, future timestamps

Write it for a plant person, not an engineer. A quality manager or a supervisor has to read this report and know what to go fix, in their own vocabulary. If it reads like a diff, it has failed.


Edge cases and failure modes

  • An export is stale by weeks and nobody noticed — the freshness check is loud, at the top, never a footnote.
  • The folder holds three months of daily files — offer latest or a range; never read everything by default.
  • A file is open and locked — handle it gracefully, name the file, continue with the rest.
  • A customer-added NetSuite field is missing — never hard-fail; report it.
  • An Infor M3 list call returns "Record does not exist" — that is an empty result, reported as empty, not a failed pull.
  • Units differ between sources — flag, do not sum.
  • A routing in minutes, actuals in hours — flag both rows, convert nothing in the dataset.
  • Two work orders agree to the hundredth of an hour per piece — that is the backflush check, not a good week. Flag probable_standard and show why.
  • A routing has no revision — revision unknown, never assumed current.

Degradation

If Limble isn't included, or no CMMS connector is live (the default) — minor. The CMMS is one of roughly ten inputs, and assets and maintenance work orders arrive in the same scheduled export as everything else. The skill treats them identically; this is precisely the case it was designed for.

The one real change: maintenance data inherits the export's freshness instead of being live. Name it explicitly in the freshness banner rather than letting it sit unlabelled among the other sources, so nobody reads exported maintenance history as this morning's tickets.

If no connector is available at all — the skill runs on the export folder alone, and that is a complete outcome. State which sources were file-sourced.

If no files are available at all — the skill runs on the live connectors alone, and that is also a complete outcome. Ask for the date window (or take it from the plant context), pull the ERP and any live CMMS connector scoped to it, and emit the tabs those connectors can fill: parts, production work orders, sales orders, inventory, assets, purchase orders, maintenance work orders.

Name every tab that could not be built — production output, downtime, inspection, plan, and lots, because lot numbers come only from the MES or quality exports — as missing, not empty. Per ../../shared/contracts/consolidated-dataset.md, an absent tab is a named gap; an empty tab reads as "nothing happened." State that every source in this run was connector-sourced, so the freshness banner is the connector timestamps, not an export cadence.

Join and classify only across the keys that exist on both sides of a connector. Do not invent MES-shaped mismatches because the MES file was never there.

If there is no routing data at all — no routing connector, no routing file — the routings tab is named missing, not left empty. An empty routings tab reads as "this part has no operations." The same holds for operation_actuals. Say which quoting rungs that removes, in one line: without routings, quote-build starts at closed-job actuals; without either, at a geometry-derived or first-principles estimate.


Chain position

  • Chain 1, RFQ to quote — step 2, between customer-inquiry-intake and quote-build
  • Chain 3, Morning plant pulse — step 1, feeding daily-production-report
  • Feeds quote-build, daily-production-report, and every reporting skill

Those skills read this dataset rather than the raw sources. If the join is wrong, they are wrong in ways that are hard to debug.

Metric. Enabling only. It does not move a plant number by itself; measure it by whether downstream skills can run.


Reference files

File Load when
reference/join-keys.md Before joining — the six keys, their sources of truth, the normalization ladder, date windows by entity, the integrity checks, and the routing and actuals signatures, cell map and backflush check
reference/mismatch-classes.md When classifying join failures — the eight classes, detection and proposed fix for each
../../shared/contracts/consolidated-dataset.md Steps 5 and 8 — the output schema every downstream skill reads
../../shared/approval-gates.md Before applying any fix — what a yes covers, and a blanket yes
../../shared/computed-figures.md Step 7 — the figures block, and reconciling it before writing

Tips for Data Consolidate

  • • Start a fresh session after installing so your agent picks up the new skill.
  • • It bundles reference files. The agent reads them only when needed, so they cost no context until then.
  • • It is part of a pack with 53 skills. Install only the ones you need with --skill to keep triggers precise.
  • • If two skills overlap, mention the one you want by name.

Questions about Data Consolidate

What does the Data Consolidate skill do?

Joins the plant's scheduled exports and connector data into one working dataset — ERP items (NetSuite or Infor M3), sales orders, production work orders, purchase orders, inventory, routings and closed-job operation actuals; CMMS assets and maintenance work orders; and the MES, historian, quality and planning files landing in the Microsoft 365 export folder.

How do I install Data Consolidate?

Run "npx alyn-cli add data-consolidate" in your project. The Alyn CLI installs it for Claude Code, Cursor, Codex and 70+ other agents. In Claude on the web, upload the skill folder as a ZIP under Customize > Skills.

Does Data Consolidate work in Cursor and Codex?

Yes. Data Consolidate uses the open SKILL.md format, so it works in Claude Code, Claude, Cursor, OpenAI Codex, Gemini CLI, GitHub Copilot and other agents that support agent skills.

What is inside the Data Consolidate skill?

The SKILL.md covers Inputs, Workflow, Step 1 — Discover, Step 2 — Freshness check, Step 3 — Pull connector data, Step 4 — Normalize keys, and the skill folder has 3 files.

What is a good alternative to Data Consolidate?

Short Drama Assets by zenstory-ai is the highest-ranked similar skill from another creator, with an Alyn Score of 70 compared to 79 for Data Consolidate.

Is Data Consolidate free?

Data Consolidate is open source on GitHub under the Apache-2.0 license. It is free to install; check the license before commercial use.

Who made Data Consolidate?

Data Consolidate is published by Anthropic in the anthropics/claude-plugins-official repository, together with 52 other skills.