Skip to content
Join free
Anthropic Official

Quote Build skill

Produces the make-to-order quote from the intake form, comparable prior jobs and cost history, with every number traced to where it came from — material at the price actually paid on a named purchase order, machine hours per operation from a labelled ladder (current routing, closed-job actuals, the confirmed design, first principles) with setup and run kept apart, setup re-amortized at each quantity break, and…

$npx alyn-cli add quote-build
View this skill on GitHubanthropics/claude-plugins-official/plugins/claude-for-manufacturing/skills/quote-build/SKILL.md
Pack stars
47,283
Pack installs
189k
Alyn Score
79/99
Updated
13 h ago
License
Apache-2.0

Anthropic

Quote Build

What is the Quote Build skill?

Quote Build is a coding skill by Anthropic for Claude Code, Cursor, Codex and other AI coding agents. Produces the make-to-order quote from the intake form, comparable prior jobs and cost history, with every number traced to where it came from — material at the price actually paid on a named purchase order, machine hours per operation from a labelled ladder (current routing, closed-job actuals, the confirmed design, first principles) with setup and run kept apart, setup re-amortized at each quantity break, and…

Pricing a make-to-order job means building up a cost and then applying commercial judgment. Every job is priced fresh, which is why quoting is skilled, slow, expert work — and why the estimator is usually the bottleneck.

What the SKILL.md covers

  • Inputs
  • Workflow
  • Step 1 — Load the intake form
  • Step 2 — Find comparables
  • Step 3 — Flag capability, then derive the hours
  • Step 4 — Build up the cost
  • Step 5 — Apply quantity breaks
  • Step 6 — Apply margin
  • Step 7 — Check the promised date against shop load
  • Step 8 — Assemble both documents
Author
Anthropic
Pack
anthropics/claude-plugins-official (53 skills)
Category
Coding, #259 of 1763
Alyn Score
79 / 99
Files
5, includes references
License
Apache-2.0
Last updated
13 h ago
Works with
Claude Code, Claude, Cursor, Codex, Gemini CLI, Copilot

Quote Build compared to similar skills

SkillAlyn ScoreGitHub starsUpdated
Quote Build · Anthropic7947k13 h ago
Codebase Design · vinvcn715.8k4 days ago
Steve Jobs Perspective · alchaincyf599815 days ago
Office Hours · Garry Tan68142k2 h ago

Install Quote Build

Pick your agent. Every command is ready to paste.

$npx alyn-cli add quote-build

Detects your agents (Claude Code, Cursor, Codex and 70+ more) and installs to the right folder. Add -g to install globally.

$npx skills add anthropics/claude-plugins-official --skill quote-build

Or use the open skills CLI directly.

01

Install it

Run the command above, or upload the folder in Claude.

02

Ask naturally

Describe the task. Your agent loads quote-build when the request matches its description.

03

Name it if needed

If it does not trigger, say “use the quote-build skill”. In Codex, type $quote-build.

The skill itself

SKILL.md

FolderGitHub

Quote Build

Pricing a make-to-order job means building up a cost and then applying commercial judgment. Every job is priced fresh, which is why quoting is skilled, slow, expert work — and why the estimator is usually the bottleneck.

The cost basis is shown, always. A quote that says $14,720 is useless. One that says $14,720, of which $6,100 is material at the price we paid on PO-8841 in June, plus 8% scrap is defensible.

Quick start

→ Load the intake form. Lines with no quantity or no material are skipped; quote the rest and list what's blocked
→ Find comparables; show what made each one comparable AND how this job differs
→ Flag capability BEFORE pricing. Then hours per op from the ladder: routing → actuals → confirmed design → first principles
→ Setup and run separate at every rung. A superseded routing is shown, never priced. probable_standard never outranks rung 3
→ Build up the cost: material, labor, machine, setup, outside processing, tooling
→ Resolve rates: MFG_* variable, then the plant profile. Never asked in the run, never invented
→ Re-amortize setup at every quantity break
→ Margin on its own line. Never buried
→ Check the promised date against real shop load. Never quote a date blind
→ Assemble the customer quote AND the internal cost-basis sheet. No hours, ranges, rates, paths or basis labels in the customer's
→ On a counter: revise in place with a change record. Never a second quote, never reopen CAD

Inputs

First, find the plant setup: from the task's own folder (never cd into the plugin), run python3 -I <this skill's folder>/../../shared/scripts/plant_setup.py find, do its setup_page_first step, then read the profile at profile_path and any rate at rates_path, per ../../shared/replies.md.

Input Source Form
The intake form customer-inquiry-intake ../../shared/contracts/intake-form.md
Consolidated dataset, including routings and operation_actuals (v4) data-consolidate ../../shared/contracts/consolidated-dataset.md
Geometry estimate, per line rfq-to-quote step 7, or typed by the estimator ../../shared/contracts/geometry-estimate.md
Machine classes, cutting data, variance threshold ### Machining data in the ## Plant context block Config
Standard cost and item master The ERP (NetSuite or Infor M3), each cost read from the field the profile's cost map names (../onboarding/reference/erp-scope.md); a field equal to the sell price is never a cost. Infor M3 gives no standard cost: last purchase price first, per ../../shared/erp-connectors.md Connector
Actual cost on prior jobs production_work_orders actual-cost columns in the dataset (v6): NetSuite closed work orders, Infor M3 work order operations, or any ERP custom-connector mapped Dataset
Recent material purchase prices ERP purchase orders Connector
Awarded supplier bid for an outside process, with its selection record supplier-quote-request, when this quote started the sourcing event ../../shared/contracts/supplier-bid.md
Prior quotes for this customer or part M365 documents, NetSuite. Infor M3: documents only Documents and connector
Labor, burden and margin rates MFG_* variable, else the plant profile — see below Config
Shop schedule and load Planning export to the M365 folder CSV/XLSX

Rates are resolved, not asked for each run, in the order ../../shared/secret-config.md, Resolving a rate, sets, and no other:

  1. MFG_LABOR_RATE, MFG_BURDEN_RATE, MFG_MARGIN_RULES, checked by name, never printed. These win; a stored value for the same rate is never printed anywhere, only named as also held.
  2. A confirmed rate in the ## Plant rates file at rates_path (an older profile: its ### Commercial rates). Price on it with no label.
  3. A placeholder in the same place. Price on it and label it, below.
  4. Nothing. Block the lines it feeds, named; the rest is still produced.

Shown on the internal cost-basis sheet, never on the customer-facing quote.

A rate typed into this run is not used: say it is not on file, do not repeat the number, and offer onboarding's "update our labour rate", which saves it with a name and date for every quote after this one.


Workflow

Step 1 — Load the intake form

Refuse to proceed on line items with no quantity or no material. Quote the rest and list what is blocked and why.

A 40-line RFQ with one underspecified item produces 39 prices and one question, not silence.

Read the commercial terms — payment, freight, packaging, liability. Where the intake form states one, carry it into the quote as given. Where one is null, quote against the plant's standard for that term, name the assumption on the exclusions list, and keep the missing-register row — do not fill it in silently. Where customer-inquiry-intake flagged a stated term as clashing with the plant's standard, carry that flag onto the exclusions list too; it does not resolve itself by arriving here.

Block on missing provenance. Where field_sources is absent from the intake form, block — without provenance the estimator cannot verify a number against the package, and a quote built on an unsourced field is a quote no one can defend.

Where quantities has only one entry but the customer's ambiguous register shows breaks were requested, quote what is there and state plainly that the breaks were not captured — never invent the missing quantity points.

Where ambiguous_register carries an entry on a field the quote depends on, quote against one value, name which, and state the other explicitly rather than silently picking one — the same discipline the intake form itself applies to a customer's conflicting statements.

Where recommendation is no_bid, it is a recommendation, not a decision. Proceed only if the estimator says to, and say so in the quote's assumptions when you do.

Check bid_decision_state, and each line's line_bid_decision, never context. declined blocks the inquiry, or that line, listed as not quoted by the estimator's decision; reopening is a new decision. draft, or a set bid_decision_reset, means no ruling covers it: quote only if told to in the run, and record on the quote that it proceeded on an unconfirmed recommendation.

inquiry_state is a different axis, and reading it as a decision is the error to avoid. superseded blocks — a later revision exists, quote that one. stale does not block and never means declined: it means the customer went quiet on open questions. Quote with exclusions naming those questions, or do not quote — but never treat the silence as a no.

Where recommendation_provisional is true, answers were still outstanding when this was scored. Quote if the estimator says to, and carry the outstanding questions onto the assumptions list — they are precisely what the price rests on. Where hard_disqualifier_stopped is true, the plant cannot build this as specified: quote only on an explicit override, with the disqualifying constraint on the exclusions list.

Read the geometry estimate's approval.status the same way. confirmed means the estimator passed Gate 3 on this model, tolerance reading and operation list. draft is unconfirmed: no hours derived from it reach a quote unless the estimator says so in this run — then the internal sheet records who said so and that the model was unconfirmed. A drawing_revision_priced_to that differs from the intake line's revision blocks: that estimate is another part.

Step 2 — Find comparables

Prior jobs for the same part number first, then similar parts by material, process and size.

Show what made each one comparable and how the new job differs. Same part, half the quantity, different finish, eighteen months of material inflation — the estimator needs those differences to weigh the comparable at all.

Where no comparable exists, say so clearly and do not produce a confident number off nothing.

Count the history in code. How many orders, how many for this customer, how many closed work orders, across what dates — each is a filter run over the data, and each goes in the figures block (../../shared/computed-figures.md) with that filter. "Consistent across five orders" written from memory misses the sixth, and the one missed tends to be the customer's own.

Step 3 — Flag capability, then derive the hours

Capability flags come before any price. Carry the intake form's constraint_violations, and check every tolerance on the geometry estimate against demonstrated capability in the Plant context: a tolerance tighter than the plant has demonstrated on that process is flagged by name, value and capability, on the internal sheet and, as a plain statement of what is quoted, in the assumptions. Pricing it first and flagging it after is how a plant commits to a tolerance it has never held.

Then hours per operation, from the ladder. Read reference/hours-ladder.md before deriving any hour. Per operation, best available first:

  1. A routing for this part and revision, cited. A routing for another revision is superseded — shown as such, never priced from.
  2. Closed-job actuals not flagged probable_standard.
  3. Geometry-derived from the confirmed estimate: the CAM path where Fusion and plant cutting data exist, the feature path always.
  4. First principles, naming what would firm it up.

probable_standard actuals never outrank rung 3. Library feeds (fusion_default) are rung 4, labelled "library defaults, not plant data." Setup and run are carried separately at every rung. Where two rungs exist the variance is computed in code and flagged above the Plant context threshold — or 15%, printed word for word as "default threshold, not plant-set" — with its drivers named. Every hour, range and variance goes to the figures block.

Step 4 — Build up the cost

Material with its scrap allowance, labor, machine and burden, setup, outside processing, tooling.

Each line cites its source — standard cost, an actual purchase price with its PO and date, or the actual cost from a specific prior work order. Labor, machine and setup use the hours from Step 3, rung by rung, never a single hours rule for the whole job. Read reference/cost-buildup.md.

Where a required rate is not supplied, build to that point and name exactly which rate is missing and which lines it blocks. Never substitute a plausible one.

No job-quantity total and no unit price for this job may appear while a required rate is unset — not from standard cost, not from price history, not as a ballpark. Every route to a number is closed, including the ones that look like something else:

  • Standard cost × quantity is a price by another name. Standard cost may be cited as a material basis per unit, labelled standard; it is never extended by the job quantity into a total while labor or burden is blocked.
  • A prior sell price × quantity is a price too. Prior sales may be listed as history — order, date, quantity, price, one line each — and are never multiplied by the requested quantity, never headed "unit price," never offered as a guide to this job.
  • "Just a ballpark" and "use a typical shop rate" get the same answer. Decline the typical rate without naming one, and do not then produce the ballpark some other way.

A placeholder is a rate, and prices the job. Where the ## Plant context block carries a rate as a marked placeholder with its assumption — recorded by the plant at onboarding, not invented here — build on it. Label every line it touches, and the cost sheet as a whole, "placeholder rate — not confirmed", and put the placeholder on the assumptions list by name. The gaps list names it, never its value. This state, "quote-build is running on a placeholder," is expected. What is still refused is any rate the model supplies itself, from a benchmark or a lookup.

A confirmed rate prices the same way, without the label. A rate the rates file records as confirmed — given by a named person on a date and approved at onboarding — is the plant's number, as much as one set in MFG_*. Cite it on the internal sheet as plant profile, confirmed by on , and leave it off the assumptions and gaps lists.

Still produce everything the rates do not touch: material at the price actually paid on a named PO with its date; the setup amortization structure at each quantity, with the dollar values blocked; outside processing and tooling where sourced; and the date check against shop load. Name each missing rate and both ways to set it — "update our labour rate" to record it on the plant's rates page, or MFG_LABOR_RATE / MFG_BURDEN_RATE in the environment — say which lines each blocks, and say the quote completes as soon as they are set.

Step 5 — Apply quantity breaks

Recompute setup amortization at each quantity the customer asked for. Setup does not scale — it is the same cost across more units, and that is the entire reason unit price drops with volume.

Show the setup contribution per unit at each break so the spread is explicable.

Setup and run stay separate at every break, at every rung. Where a source gives only a lumped total, the split is unknown: say so, and never re-amortize it — use the highest rung that carries a split for the break arithmetic.

Step 6 — Apply margin

Per the configured rules, shown as its own line and never buried. An estimator negotiating needs to see exactly how much room they have.

Step 7 — Check the promised date against shop load

Read the planning export and answer whether the requested date is achievable given what is already committed, plus material and outside-processing lead time. The work content is setup plus run hours by work center from each operation's winning rung, and the check names that basis.

If it cannot be met, say so and give the earliest date that can. Quoting a date the shop cannot hit is how a plant loses a customer twice.

Without a planning export, the quote carries a stated lead time with an explicit "not checked against shop load" caveat — never a silent omission. Read reference/date-and-load.md.

Step 8 — Assemble both documents

The customer-facing quote in the plant's template, and the internal cost-basis sheet the estimator keeps and defends.

Emit the customer quote between delimiters, and keep everything internal outside them:

=== CUSTOMER QUOTE — SENDABLE ===
…the quote, and only the quote…
=== END ===

The cost-basis sheet is its own delimited document, so both are explicit and neither can be mistaken for the other:

=== INTERNAL COST SHEET — NOT FOR CUSTOMER ===
…the buildup, every source, each rate against its source, the
hours per operation with rung, path, cutting data basis, setup and run,
range, variance and drivers, the comparables, the margin line, the
figures block…
=== END ===

Notes to the estimator that belong to neither document go outside both blocks. Narrative cost prose with no delimiter is not a cost sheet. An assumption that reveals pricing policy is internal: "no customer was named, so the default margin rule applies; a different rule is configured for another customer" is useful to the estimator and must never sit inside the quote. On the internal sheet, show each rate's value against its source — MFG_LABOR_RATE, plant profile, confirmed by on , or plant profile, placeholder — that is what makes the basis defensible.

The customer quote states what was quoted, not how it was estimated. Its assumptions name the drawing revision priced to and the tolerances as read — "priced to PN-4471-B Rev 2; unspecified tolerances ±0.005 in per the drawing's general note" — and any capability flag as a statement of scope.

Then read the block alone, and reject it if it holds any hours figure — setup, run, cycle or machine time, per piece or per job — any low, expected or high range, any rung, path or source of an hour (routing, actuals, CAM, feature path, geometry estimate, first principles), any cutting-data basis label (plant_library, estimator_entered, fusion_default, library defaults), any variance, probable_standard, or anything from cost_down_proposals; any rate value — from an MFG_* variable or the plant profile, or a figure that is one times something — the word "margin" in any form — "margin applied," "standard margin," "at our usual margin," a margin percentage, or a line item called margin — any description of which pricing rule was used, or any customer's name but the addressee's. The customer sees prices; how they were arrived at is the internal sheet's business. A rejected block is rewritten before anything is sent, not annotated. The full list is ../../shared/secret-config.md, The outbound document check.

Step 9 — Handle the negotiation loop

When a customer counters, revise the existing quote in place and preserve a change record of what moved and why.

A counter is not a new quote. Treating it as one is how a plant ends up with four versions in circulation and no record of what was conceded. Re-derive the affected lines rather than patching the total, and where a price dropped with no scope change, say that margin moved. Re-derive from the stored operation record — a price counter never reopens CAD. A new drawing revision is not a counter: it goes back to rfq-to-quote step 7. Read reference/revisions.md.


Approval gates

Nothing reaches a customer without the estimator releasing it. This is Chain 1's fourth gate, at step 11. Gate 1 is the estimator sending the open questions at step 4; Gate 2 is confirming the bid/no-bid at step 5; Gate 3 is confirming the design, tolerance reading and operation list at step 8 — no geometry-derived hour is priced without it or a recorded override. The quote is drafted, shown with its cost basis, and sent by a person.

Every revision goes through the same gate. A second version of an approved quote is not pre-approved.

Rates are resolved per ../../shared/secret-config.md and shown only where the audience rule allows. Nothing is written back to the ERP; the quote is a document the estimator files and sends. The margin line appears on the internal cost-basis sheet, never on the customer-facing quote.


Output

Every document this skill produces is printed in the reply, in full. Saving a copy to a file as well is fine, as Word or Excel per ../../shared/replies.md, never .txt; a file instead of the reply is not. The person reads the reply, and every delimited block and outbound check lives in it — a document only on disk has been neither seen nor checked. A record handed to another skill is saved and summarised, never pasted as raw YAML; memory blocks are written where the plant's memory lives; and the name on an approval is asked, never taken from the account. All three per ../../shared/replies.md.

The customer-facing quote — line items, prices, quantity breaks, lead time, validity period, terms (payment, freight, packaging, liability — as the customer stated them, or the plant's standard where one was never stated), and the assumptions and exclusions list.

Per ../../shared/artifact-style.md, a quote is a controlled document and uses the plant's own template captured during onboarding, never the house style.

The internal cost-basis sheet — the full buildup with every source cited, the comparables used and how they differ, the margin applied, and every assumption made. The estimator hands this to their manager and defends the price without re-deriving it. It carries the figures block — every count of orders, lines and comparables, and every extended figure, with the filter or arithmetic behind it. Internal only; it never appears in the customer quote.

The hours-basis table, on the internal sheet — per operation: rung, path, cutting-data basis, setup and run with their range, every other rung with its variance, the variance drivers, and the toolpath check where the CAM path ran. Any cost_down_proposals from the geometry estimate sit here, internal only.

The operation record — kept with the quote, so a counter re-prices without reopening anything and the estimate can one day be compared with the job's actuals. Its fields are in reference/hours-ladder.md.

The assumptions and exclusions list — explicit, including any commercial term quoted against the plant's standard because the customer never stated one, or flagged because a stated one clashed with the plant's. This is what protects the plant when the customer's expectations diverge later, and it is the section everyone skips.

Revision history — when revising, with what changed and why.

The Sales command-center page — Chain 1's closing step. Commercial performance for the period, carrying the intake record and the quote by reference so the page reads from what was actually sent rather than a separate summary of it. Produced as an artifact you place; nothing is written to a system. The customer-facing version carries no margin line. Read ../../shared/command-center.md.


Edge cases and failure modes

  • No comparable exists — a genuinely new part. Say so; do not produce a confident number off nothing.
  • Material price is volatile — cite the price as of its date and add a validity caveat to the quote.
  • The requested date is impossible — never quietly quote a date the shop cannot hit.
  • A quantity far outside anything the plant has run — flag the extrapolation explicitly. A price at 50,000 derived from experience at 500 is not a quote.
  • Currency or unit mismatches between the RFQ and our cost data — surface them rather than converting silently.
  • A required rate was not supplied — name which one and which lines it blocks. Never invent it, and produce no total and no unit price for the job by any other route — see Step 4.
  • The cost history is stale — cite each figure as of the date its work order closed. A comparable priced in a different material market is still useful, but only if its age is visible.
  • A spec on the intake form has no source reference — block that spec. An unsourced tolerance is an inference, and inferences get priced and then committed to contractually.
  • A commercial term (payment, freight, packaging, liability) was never stated — quote against the plant's standard for that term and name the assumption on the exclusions list. Never fill it in silently.
  • The only routing is for an earlier revision — superseded. Show it as such; derive from the next rung. Never price the new revision on it.
  • Actuals agree to within 1% — probable_standard. Shown, never above a geometry-derived estimate.
  • The geometry estimate is still draft — no hours from it reach a quote without the estimator's say-so in the run, recorded on the internal sheet.
  • A Plant context value is tagged assumed — use it, label it, and name it as a variance driver where it explains more of a gap than the threshold.

Degradation

Runs on the intake form plus pasted cost figures with no connector at all.

Not available What happens
The ERP (NetSuite or Infor M3) No standard cost, actual cost or purchase-price history. Ask for material prices and rates directly, and label the whole buildup as supplied rather than sourced
Closed-work-order cost Build up from standard cost, labelled "standard cost (3rd preference, no actual-cost comparable)" — standard cost does not say whether the last job made money
The intake form Treat the request as a minimal intake: part and quantity as the user stated them, every other field null and on the missing register. Build from the best basis available and label it. A recorded placeholder rate counts as a set rate
Purchase-order history Price material from a current supplier quote or a supplied figure, with its date
Planning export Quote a stated lead time with the explicit "not checked against shop load" caveat
Prior quotes No precedent for this customer. State it rather than reading absence as a new relationship
The plant's quote template Use a neutral quote structure covering every section above, and flag that the controlled template was unavailable
Routings and actuals The ladder starts at rung 3, or rung 4 where there is no confirmed geometry estimate. Name both tabs missing
Geometry estimate No rung 3 for that line. Say the design step did not run and why; the ladder runs on what exists
A drawing (path A, text specs only) A ROM, never a firm quote: ROM on the internal sheet, a budgetary estimate on the customer document, nothing about method. An override does not make it firm. reference/hours-ladder.md, Path A
Fusion, or its Manufacturing workspace Feature path only, and the internal sheet says so. No toolpath check is claimed
Plant cutting data The CAM path runs on library feeds, labelled fusion_default, rung 4. The feature path cannot time a cut; that op is rung 4
Machining data in the Plant context No plant setup or tool-change values, no cell map, and a variance threshold of 15% printed as "default threshold, not plant-set"

Chain position

Chain 1, RFQ to quote — the final step, depending on customer-inquiry-intake and data-consolidate as two independent inputs, not a pipe from one through the other.

Both this step and the intake's bid/no-bid depend on cost history. If the ERP is not connected, both degrade to document-based comparables and the chain says so rather than quietly producing weaker output.

Metric. Quote turnaround; hit rate; the unbid book.


Reference files

File Load when
reference/hours-ladder.md Step 3 — always, before any hour: the ladder, setup and run, ranges, variance, the CAM and feature paths, the per-op sheet columns and the operation record
reference/cost-buildup.md Steps 2 to 6 — the seven lines, their sources, comparables, and quantity breaks
reference/date-and-load.md Step 7 — the load check, its scope boundary, and the caveat when it cannot run
reference/revisions.md Step 9 — the change record, re-deriving from the operation record, and why a new drawing revision is not a counter
../../shared/contracts/geometry-estimate.md Steps 1 and 3 — the geometry estimate, its approval state and what blocks it
../../shared/computed-figures.md Steps 2 and 7 — the figures block every stated count is quoted from
../../shared/contracts/intake-form.md Step 1 — the intake shape, a line with no quantity or no material, the missing behavior for a null commercial term, an ambiguous register entry, uncaptured quantity breaks, a no_bid recommendation, the bid_decision_state gate, and absent field_sources

Tips for Quote Build

  • • Start a fresh session after installing so your agent picks up the new skill.
  • • It bundles reference files. The agent reads them only when needed, so they cost no context until then.
  • • It is part of a pack with 53 skills. Install only the ones you need with --skill to keep triggers precise.
  • • If two skills overlap, mention the one you want by name.

Questions about Quote Build

What does the Quote Build skill do?

Produces the make-to-order quote from the intake form, comparable prior jobs and cost history, with every number traced to where it came from — material at the price actually paid on a named purchase order, machine hours per operation from a labelled ladder (current routing, closed-job actuals, the confirmed design, first principles) with setup and run kept apart, setup re-amortized at each quantity break, and…

How do I install Quote Build?

Run "npx alyn-cli add quote-build" in your project. The Alyn CLI installs it for Claude Code, Cursor, Codex and 70+ other agents. In Claude on the web, upload the skill folder as a ZIP under Customize > Skills.

Does Quote Build work in Cursor and Codex?

Yes. Quote Build uses the open SKILL.md format, so it works in Claude Code, Claude, Cursor, OpenAI Codex, Gemini CLI, GitHub Copilot and other agents that support agent skills.

What is inside the Quote Build skill?

The SKILL.md covers Inputs, Workflow, Step 1 — Load the intake form, Step 2 — Find comparables, Step 3 — Flag capability, then derive the hours, Step 4 — Build up the cost, and the skill folder has 5 files.

What is a good alternative to Quote Build?

Codebase Design by vinvcn is the highest-ranked similar skill from another creator, with an Alyn Score of 71 compared to 79 for Quote Build.

Is Quote Build free?

Quote Build is open source on GitHub under the Apache-2.0 license. It is free to install; check the license before commercial use.

Who made Quote Build?

Quote Build is published by Anthropic in the anthropics/claude-plugins-official repository, together with 52 other skills.

Similar skills. From other creators.